Conduit bending calculator 90° stub-up calculator

90° stub-up calculator

Pick the conduit and size, type the stub height you need. You get where to put the mark for the arrow of the bender.

Conduit
Trade size

inches, stamped on the bender

inches

How it works

Mark = stub height − take-up, measured from the end of the conduit. Line the mark up with the arrow on the bender and bend to 90°.

Take-up depends on the bender. Typical hand-bender values: EMT 1/2″ 5″, 3/4″ 6″, 1″ 8″, 1-1/4″ 11″; rigid 1/2″ 6″, 3/4″ 8″, 1″ 11″. Check the number stamped on your own bender, and choose "Custom" to type it.

Worked example. A 12″ stub on 1/2″ EMT (take-up 5″): mark at 7″ from the end.

Questions

What is the take-up for 1/2 inch EMT?

5″ on a typical hand bender. 3/4″ EMT is 6″ and 1″ EMT is 8″. Always check the value on your own bender.

Why is my stub too short?

If the stub height is less than the take-up, the bend cannot be made with that bender. Use a taller stub or a bender with a smaller take-up.